Conifer Energy chose SUBLATUS to complete the comprehensive decommissioning and demolition of their gas plant facility in Redwater, Alberta. This project included asbestos abatement, removal of processing equipment, buildings, tanks, flare stacks, and catalyst waste disposal. To maintain efficiency, safety, and environmental responsibility, precise planning and consistent, careful execution were crucial.

Safe Demolition in an Active Industrial Environment
$0M
Total project value
0 T
Scrap metal recycled
0 T
Catalyst waste removed
0 T
Non-ferrous metals recycled

The Numbers

A Demanding Demolition With Impactful Results

Extensive material handling and careful scheduling within an operationally active facility were two key requirements for this project. To minimize environmental impact at every level, we managed recycling initiatives to enhance project value and oversaw significant volumes of demolition waste and catalyst handling. Some key figures from this project include:

Background

How We Work

Where Complexity Meets Coordination

Scope of Work

Scope of Work

The project involved executing demolition activities on an active industrial site while maintaining coordination with ongoing plant operations. Sublatus’ responsibilities included managing heavy equipment movement and truck traffic through active work zones, ensuring continuous site access and operational safety. Work was carried out through unpredictable and severe winter conditions, requiring adaptive scheduling, specialized safety controls, and consistent communication with facility management to maintain both productivity and compliance.

Our Approach

Our Approach

To minimize disruption to site operations, we carefully coordinated all project sequencing. While specialized subcontractors handled asbestos abatement, our experienced team performed demolition tasks, maintained strict safety measures, and adjusted daily operations based on ever-changing winter weather conditions.

The Results

The Results

Despite challenging winter conditions and ongoing facility operations, we completed the project safely, on schedule, and within budget. All metal by-products were successfully recycled, and the site was meticulously cleared and prepared for future use, meeting all client expectations and leaving no trace.