
PigeonLakeRemediationandReclamation
Full-Scale Solutions
Restoring Value, Reviving Land
Imperial Oil engaged Sublatus Environmental as Prime Contractor to manage full-scale remediation and reclamation across abandoned well sites within Pigeon Lake Reserve. Sublatus coordinated with Nation contractors and consultants to execute complex scopes including landfill and backfill operations, wetland restoration, vegetation control, borehole drilling, and road reconstruction. Their integrated project management approach encompassed cost estimating, health and safety oversight, and contractor capacity building, ensuring safe, compliant, and efficient site recovery throughout the program.

The Numbers
Targeted Cleanup, Proven Performance
The Pigeon Lake Remediation and Reclamation Program involved extensive site work across dozens of locations, requiring coordinated efforts in soil management, equipment mobilization, and contractor engagement. Sublatus oversaw detailed execution scopes including landfill operations, backfill hauling, vegetation control, and borehole drilling. The program emphasized First Nation contractor utilization and tracked equipment hours, personnel roles, and site-specific scopes to ensure transparent and impactful delivery. Some figures for this project include:
How We Work
Clean Solutions, Confident Results

Scope of Work
The Pigeon Lake Program encompasses a wide range of remediation and reclamation activities across Imperial Oil’s abandoned well sites within Pigeon Lake Reserve 138A. As Prime Contractor, Sublatus Environmental is responsible for coordinating project execution, including contaminated soil remediation, wetland restoration, vegetation control, borehole drilling, and road reconstruction. The scope also includes landfill and backfill operations, site maintenance, and contractor capacity building, all delivered in collaboration with Nation-owned companies and in alignment with environmental and safety standards.

Our Approach
To deliver this multi-year remediation and reclamation program, Sublatus Environmental leads as Prime Contractor with a focus on collaboration, safety, and capacity building. Our team coordinates with Nation-owned contractors and consultants to execute site work efficiently and responsibly. We provide support in health and safety, project coordination, and administration, while promoting sustainable practices and strengthening long-term local contractor capabilities for successful project delivery.

The Results
While the Pigeon Lake Program is still underway, our team continues to deliver impactful outcomes across dozens of remediation and reclamation sites. From wetland restoration and vegetation control to borehole drilling and road reconstruction, each scope is executed with precision and care. We remain committed to working collaboratively with Nation contractors and stakeholders, ensuring that every phase of the project meets environmental standards and community expectations. As we progress, we will continue to uphold our values and deliver meaningful results.

Let’s Connect
Ready to Discuss Your Project?
Our team is ready to manage your demolition, remediation, or environmental project. Contact us to discuss tailored solutions for your site.